Many sewage treatment plants (STPs) in tourist villages, hotels and residential compounds were built years ago and are now under-performing: bad odours reach the chalets, the effluent is cloudy, sludge builds up, and the treated water is not fit for irrigation. Target diagnoses the root cause and brings the plant back to its design performance, often without building a new one.
Our engineer inspects the plant, checks each treatment stage, and takes samples to understand the real flow, load and performance. On the North Coast we have an engineer who covers site visits in the area.
We explain what is wrong and why, then propose the most economical fix: operational changes, repairs, replacement of key equipment, a capacity upgrade, or a combination.
Typical work includes replacing aeration diffusers and blowers, adding equalisation or extra treatment stages, upgrading tertiary filtration and disinfection for irrigation reuse, installing chemical dosing, and odour control at the source.
After the work, we can support your operators with chemicals, routine checks and service visits so the plant keeps performing through the high season.
Tourist villages and resorts on the North Coast and Red Sea, hotels, residential compounds, hospitals, labour camps and factories with domestic sewage.
Send us a few photos and the plant capacity on WhatsApp, or book a site visit. We cover the North Coast, the Red Sea and Greater Cairo.
WhatsApp +20 100 397 7750 Request a Quote